Product Description
DESCRIPTION
MIPRO-EP is an 100% solid epoxy polyamide primer.
RECOMMENDED USES
Specially formulated high viscous product for use with the mortar or any high built system that requires extra bonding properties. Exhibit excellent adhesions between mortar and the substrate and enhance the application of this high built system.
BENEFITS Fast drying. Excellent adhesion to concrete. Compatible with most surfaces and top coat. Maximum thickness for working with mortar system.
COLOURS Dark amber
SPECIFICATION
Substrate to be coated must be sound, clean and free from any contamination. Enclosed shot blasting or scarification should be employed followed by thorough vacuuming. All applications must be carried out in accordance with manufacturers' written instructions.
APPLICATION PROCEDURE Surface preparation Method are depending on the type of surface and service condition which it will operate. Specific recommendation.
Mixing
Stir each component separately using a slow speed (300-400) electric drill fitted with a paint mixer or a wing type mixing paddle. Then pour the entire content of Part B into Part A and continue to mix for 2-3 minutes before use.
Applications
Apply MIPRO-EP within its pot life.
Thinning
For excellent performance, no thinning required.
Method Of Application
Brush, roller (short hair mohair roller) Epoxy mortar screed should be laid immediately after the primer is applied before it dries up.
Health & Safety
Strict precautions as the use of other combustible, volatile solvent must be observed. Some of the components of this product may be hazardous during mixing and application. For further information, refer to the product Material Safety Data Sheet , available upon request.
ADDITIONAL INFORMATION
With a wealth of technical and practical experience built up over many years in pursuit of excellent especially in the flooring and concrete technology, make us your partner today! Contact us at hot line below.
Technical Specifications
Temperature resistance | 60o C |
No. of coats recommended | 1 |
No. of component | 2 |
Mixing ratio | 1:05 by weight of Part A & Part B |
Pot life | 30 mins at 32oC |
Drying time | Touch dry : 2 to 3 hour |
Recoat | 6 hrs at 32oC |
Packaging | 5 & 20 kg |
Estimated coverage | 4.0m2 /kg/coat |